"It started with a phone call presenting their product. We liked the concept and sent requested technical information to Opt-E as a basis for an evaluation of possible savings. The calculations of the savings were attractive, and we agreed on a “feed study” and on-board visits where Opt-E could make some measurements and have discussions with the chief engineer. We then executed a business case that was approved internally. Opt-E SCAPE equipment was installed on board and commissioned with good results. The savings quickly turned out to be according to Opt-E’s calculations. The installation has worked excellently, and we are very pleased with the result."
"The process of mapping our cooling needs and implementing an energy-saving system has been very effective. The best solution is found by diving deep into the system itself to uncover the actual needs, rather than simply optimizing individual components. Opt-E excels in system understanding, and together we have developed a solution that delivers significant energy savings while also providing better cooling capacity than before."
“By installing Opt-E SCAPE® from Opt-E on our cooling water pumps, we have gained online monitoring of operations in the pump station, as well as recommendations for improvements in the event of deviations, enabling us to operate optimally under all operating conditions. Throughout the implementation process, we have had close and productive collaboration with Opt-E, whose strong expertise in pumps and automation has demonstrated flexibility in delivering effective solutions for Herøya Industrial Park. The result is a contribution to more sustainable operation of the water systems in the industrial park, which we are very satisfied with.”
“Choosing Opt-E’s technology platform to present and report our rotating machinery diagnostics was an easy decision. A clear and intuitive dashboard, serving as a foundation for data-driven decision-making, brings us a major step closer to a fully integrated Industry 4.0 solution.”
“Opt-E has helped us reduce energy consumption and wear on our processing facility at MOWI Fjæra. We have received clear and comprehensive reports, and have experienced strong collaboration and follow-up since Opt-E SCAPE® was implemented.”
Previous
Next